.925 Sterling Silver Bezel Set 3.5mm Created Gemstone Solitaire Stud Earrings

.925 Sterling Silver Bezel Set 3.5mm Created Gemstone Solitaire Stud Earrings

Purple Amethyst
$113.99
Skip to product information
.925 Sterling Silver Bezel Set 3.5mm Created Gemstone Solitaire Stud Earrings
1/19
.925 Sterling Silver Bezel Set 3.5mm Created Gemstone Solitaire Stud Earrings
$113.99

Striking and timeless, these stunning .925 sterling silver solitaire stud earrings feature bold sapphire gemstones in a bezel setting. The gemstones are 3.5mm and treated blue in color. The notched posts and friction backs keep these pierced earrings safe and secure on your ears for comfortable, wear all day long. This authentic design is crafted of real 92.5% sterling silver that has been electro-coated with genuine rhodium (a platinum-family metal), a precious metal that will keep a tarnish-free shine for years to come. These stud style earrings are subtle enough for casual affairs but sparkle in formal settings as well.

Intentional design

We make things that look better and last longer.

Quality first

We obsess over the details and strive to deliver the best products at the best prices, every time.

Customer care

We're always on your side: keeping our loyal customers happy is our top priority and number one goal.